Longmont United Hospital Central Utility Plant Expansion & Emergency Department
Longmont, Colorado
The Central Utility Plant Expansion provides the necessary utilities for the hospital expansion and is essential to the infrastructure of the hospital. This expansion consists of a two-story structure. The 4,807 sqft., 1st floor expanded the utility plant to include two 300 ton chillers, a 600 ton cooling tower, a 250 horsepower steam boiler, an emergency generator, new paralleling gear, main transformer, a 10,000 gallon fuel tank and the auxiliary equipment. The existing 1,500-gallon oxygen tank was replaced with a 3,000-gallon tank. The Emergency Department expanded to 24 treatment rooms including four private trauma rooms. To streamline operations at the door, there are three triage rooms to direct the appropriate levels of care from minor ailments to serious conditions. X-ray, CT Scanner, and a laboratory now reside in the Emergency Department.
General Contractor: GE Johnson Construction Company
Engineer: Cator, Ruma & Associates, Co.
Architect: RTA Architects
Electrical Value: $4,100,000
Project Type: Design Assist
| Porter Adventist Hospital. Denver, Colorado | :View: | $10,600,000 |
| Summit County Medical Center. Frisco, Colorado | :View: | $3,700,000 |
| Longmont United Hospital. Longmont, Colorado | :View: | $4,100,000 |