Sports + Entertainment
Air Force Academy Falcon Stadium
General Contractor: GE Johnson
Completion Date: November 2024
The Falcon Stadium expansion spans 124,000 square feet. The stadium is equipped with state-of-the-art technology to enhance its reputation as a world-class destination and its design showcases the stunning mountainous landscape and blue skies while maintaining a consistent mid-century modern design found throughout the campus. Adding to the awe-inspiring, majestic atmosphere is the sight and sound of planes flying overhead, echoing throughout the stadium.
Encore Electric is proud to provide all power and distribution including sports lighting, emergency and essential power, fire alarm, and special systems raceway including tele/data, access control, CCTV, and AV for this project. The first floor includes kitchens, concessions, restrooms, and office space and the second floor features the VIP club level with luxury seating boxes, two bars, buffets, and a dining area.
Read more about the Air Force Academy Falcon Stadium.