SAFETY BULLETIN – Bicep Injury During Removal of Ceiling OR Light Fixture
Recordable Injury / Serious Potential
Incident Description
At the end of the workday, two employees on separate ladders were removing a ceiling-mounted 2×4 OR light fixture (50 lbs.) during demolition, each supporting opposite ends. After one employee cut the hanger wires on his side, the second employee supported his end with his left hand while cutting the remaining hanger wires with linesman pliers in his right. When the final wire was cut, the fixture became unbalanced and shifted unexpectedly, striking his left bicep and forearm. The employee reported the injury after the fixture was placed in the designated trash pile. Initial observations indicated a possible torn bicep.
Root Cause Analysis – 5 Whys
- Body Positioning: The employee’s arm was in the path of the fixture as it shifted.
- Insufficient Support: Additional manpower or mechanical means were not used to control the fixture during removal.
- Change in Work Method: The method was changed to eliminate electrical and struck-by hazards, but it introduced new physical risks.
- Work Sequence: The ceiling was demolished before the fixtures were removed, increasing the potential for fixtures to shift.
- Failure to Reassess: The work plan was not reevaluated when field conditions and sequencing changed.
Key Takeaways and Preventative Actions
Even routine demolition can create unexpected hazards when conditions change. The weight, balance, attachment points, and employee positioning must be considered before removing any fixture. Moving away from one hazard does not make the new approach automatically safe—when the work changes, stop and evaluate the new risks.
Employees and field leadership must:
- Evaluate Changing Conditions: Reassess the plan whenever conditions, sequencing, or methods change.
- Use Adequate Resources: Add manpower, lifting equipment, or mechanical means to support and control materials.
- Maintain Proper Body Positioning: Keep hands, arms, and body out of pinch points and the path of shifting or falling materials.
- Plan the Work Sequence: Order demolition activities to avoid creating new hazards.
- Exercise Stop Work: If conditions are no longer as anticipated, stop and reassess before proceeding.
Why This Is Important to You
Muscle and tendon injuries happen in seconds, even during familiar tasks. Here, the fixture became unbalanced the moment the final wire was cut, and the employee’s arm absorbed the movement. Before supporting, lifting, lowering, or removing materials, ask yourself: If this shifts, drops, or becomes unbalanced, where will my hands and body be? Taking a few extra minutes to bring in help, use mechanical assistance, or change the sequence is always better than risking a life-altering injury.
STOP. THINK. REASSESS.
Before proceeding, ask:
- Has anything changed from our original work plan?
- Do we have enough people and the right equipment?
- Am I positioned outside the line of fire?
- Can we perform this task in a safer way?
If conditions change, exercise your STOP WORK. No task is so urgent that it cannot be stopped and reassessed.
Our expectation: Plan the work, recognize changing conditions, use available resources, and never hesitate to stop work when something doesn’t look right.